







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Trusted Bathroom Remodeling for Santa Rosa Homeowners
Most bathrooms in Santa Rosa were built for a different decade. Tile set on drywall instead of a waterproof membrane, a tub squeezed into a five-foot alcove, one vanity with no outlet near the mirror. When the grout starts failing in a 1970s Ranch-style home off Montgomery Drive, it’s rarely a cosmetic problem. Water has usually been getting behind the tile for a while.

Rowan Construction Group Santa Rosa handles bathroom remodeling as one of our seven residential trades. Every project gets a flat written price and a written scope before anyone picks up a tool. Our technicians have up to 19 years of experience, they’re background-checked and uniformed, and a live person answers the phone around the clock. Call (833) 842-1866 and we’ll schedule a free estimate at a time that works.
You’ll get a documented photo record of the bathroom as we found it, and another when the crew leaves. That evidence is included, not an add-on.
What Our Bathroom Remodeling Service Includes

Bathroom work breaks into distinct jobs, and the written scope names which ones yours needs. Here’s what each actually involves.
Full Bathroom Remodeling
A full remodel means stripping the room to the studs, replacing the wet-area substrate, and rebuilding from the drain up. You need one when a bathroom has more than one failing system at once: a leaking shower pan, corroded supply lines, and a floor that flexes underfoot all point the same direction. Rowan Construction Group quotes the whole sequence as one flat price with a written scope, so tile removal, waterproofing, plumbing rough-in, and finish work show up as line items rather than surprises.
Walk-In Showers & Shower Remodeling
Shower remodeling rebuilds the enclosure, the waterproofing behind it, and the valve that controls it. It’s the right scope when the tile is sound in places but the curb is crumbling, the pan holds water, or the existing shower is a prefab unit that’s cracked at the seams. We set Schluter waterproofing systems under the tile so the substrate behind the wall stays dry, and we document the membrane before tile goes down.
Tub-to-Shower Conversion
A tub-to-shower conversion removes the tub, reworks the drain and supply, and pours a sloped shower pan in the same footprint. Homeowners usually come to this when a household member can’t safely step over a tub wall anymore, or when a tub sits unused while everyone showers elsewhere. Rowan rebuilds the valve and drain while the floor is open, which saves reopening the wall later.
Vanities
Vanity work covers the cabinet, the countertop, the sink, and the plumbing connections behind them. It’s a smaller job than a full remodel and often the highest-impact one per dollar, especially in a bathroom where the cabinet is water-swollen at the base. We set vanities level, seal the counter-to-wall joint properly, and confirm the supply stops work before the new cabinet goes in.
Tile & Fixtures
Tile and fixture work is the finish layer: floor tile, wall tile, shower trim, faucets, showerheads, and the toilet. You need it when the layout is fine but the surfaces are not, which is common in Santa Rosa homes where a prior tile job was set directly on drywall with mastic. We replace the substrate where it’s compromised and install Kohler or Toto fixtures on the written scope.
Small Bathroom Remodels
A small bathroom remodel is scoped to a powder room, a hall bath, or any bathroom under roughly 40 square feet. Smaller rooms cost less in materials but more per square foot in labor, because tight spaces slow every trade down. We plan the sequence so the toilet and sink are out of the way for the shortest stretch possible in a one-bath home.
Walk-In Shower Installation
Walk-in shower installation builds a new curbless or low-curb shower where none existed, or replaces a tub-and-shower combo outright. It suits homeowners planning to stay in the house long term, since a step-free entry removes the fall risk a tub wall creates. Frameless glass enclosures are quoted separately within the same written price, and we set Sterling or Grohe trim based on what you pick.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Brands We Service for Bathroom Remodeling
Fixtures last longer than most people expect, and the failure points are predictable. Toto toilets are built around a gravity flush that clogs far less than older pressure-assist models, but the fill valve and flapper are the parts that wear first, usually at the five-to-seven year mark. When a Toto starts running between flushes, it’s almost always the flapper, not the bowl. Kohler faucets hold up well at the cartridge, though the aerator screen collects Santa Rosa’s harder water and needs clearing before anyone assumes the valve has failed.
Schluter shower systems are the waterproofing layer we set under tile, and they perform exactly as well as the install behind them allows. We check the drain bonding flange and the seam banding before tile goes anywhere near the wall. Grohe thermostatic valves need their cartridge checked before we assume a pressure problem, since a scaled cartridge mimics low water pressure almost perfectly. Whether your bathroom has Toto, Kohler, Schluter, Grohe, or any other make, we can help.

Signs You Need Bathroom Remodeling Right Now
- Grout that crumbles when you touch it. Soft, sandy grout in a shower means water is already behind the tile. The substrate is likely swollen, and the fix is waterproofing, not re-grouting.
- A floor that flexes near the toilet. Movement underfoot points to a rotted subfloor or a loose flange. A loose flange lets sewer gas and moisture into the floor cavity, so it’s worth opening up sooner rather than later.
- Water staining on the ceiling below. A stain under a second-floor bathroom is the shower pan or the drain connection telling you it’s failed. Stains that grow between showers mean an active leak, not condensation.
- A tub you can no longer step over safely. Tub walls run about 15 to 17 inches high, which becomes a real hazard after a hip replacement or a balance change. A tub-to-shower conversion addresses this directly.
- Mold that returns after cleaning. Mold that comes back within weeks in the same corner means the room isn’t drying out. That usually traces to a failed exhaust fan ducted into the attic instead of outdoors, which is common in older Santa Rosa homes.
None of these require a panic call. But a slow leak behind a shower wall does more damage the longer it runs, and the repair cost climbs with it. Call (833) 842-1866 and we’ll take a look before it gets worse.
Our Bathroom Remodeling Process – Step by Step
- 1
Free estimate and written price. We walk the bathroom, check the substrate condition, and confirm what’s behind the tile where we can. You get a flat written price with a written scope before any work begins. Under Clause 1 of The Haven Standard, the price is written before anyone starts.
- 2
Second opinion, if you want one. Bring a competitor’s estimate and we’ll review it line by line at no charge. It’s a standing offer, and it’s useful when two quotes differ by a factor of two on the same scope.
- 3
Signed change orders only. If we open a wall and find something the estimate couldn’t see, work on that change stops until you’ve signed a change order. This is the discipline that keeps projects within a few percent of the agreed cost, and it’s why we quote in writing in the first place.
- 4
Demolition, waterproofing, and rough-in. We strip to the studs, replace compromised substrate, and set the waterproofing membrane. We photograph the membrane, the drain connection, and the plumbing rough-in before tile covers any of it.
- 5
Finish, documentation, and walkthrough. Tile, fixtures, glass, and trim go in, then we walk the room with you. You get the photo record of the whole job and the 365-Day Done Right Promise in writing: if it isn’t done right, we make it right.
See the difference
Before
After
Before
After
Before
AfterHow Much Does Bathroom Remodeling Cost in Santa Rosa?

A typical full bathroom remodel in Santa Rosa runs $9,000 – $28,000 depending on size, how much plumbing moves, and the finish level. A small bathroom remodel, scoped to a powder room or hall bath, runs $5,000 – $12,000. If you’re converting a tub to a shower, plan on $3,500 – $10,000, and a standalone walk-in shower installation runs $4,500 – $12,000. Replacing a shower by itself falls in the $3,000 – $8,500 range, and a vanity installation is $800 – $3,000.
What moves the number: whether the drain relocates (moving a drain means cutting the floor and re-pitching the pan), the tile you choose, whether the substrate behind the wall is rotted, and whether the valve has to be replaced to meet current code. What doesn’t move it: whether you pick Kohler or Toto, generally, since the price gap between quality fixtures is smaller than the labor gap.
How to avoid overpaying: get the scope in writing and compare line items, not totals. A quote that’s $4,000 lower is often missing waterproofing or substrate replacement. That’s exactly what the free second opinion is for. Call (833) 842-1866 for an exact quote; estimates are free and come with a written scope.
Bathroom Remodeling Near Santa Rosa – Our Service Area
We work across Santa Rosa and the surrounding North Bay: Rohnert Park, Petaluma, Sonoma, Napa, Novato, San Anselmo, San Rafael, Larkspur, Vallejo, American Canyon, and Hercules. Scheduling depends on the drive and the crew’s calendar, so we’ll give you an honest window when you call rather than a number we can’t hold. If you’re in a neighboring city, our Bathroom Remodeling in Rohnert Park and Bathroom Remodeling in Petaluma pages cover local specifics. You can also start from our home page to see all seven trades.
Serving Santa Rosa, CA – Our Local Coverage Area
We serve Santa Rosa and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions – Bathroom Remodeling in Santa Rosa

Bathroom remodeling is the process of rebuilding a bathroom’s wet area – the waterproofing, plumbing, tile, and fixtures – rather than just updating the surfaces. It ranges from a vanity swap to a full gut remodel where the room comes down to the studs. The scope is written out line by line before work starts, in every case. Rowan Construction Group quotes each bathroom as a flat price with a written warranty attached.
A small bathroom remodel usually runs one to two weeks, while a full remodel with plumbing changes takes three to five weeks. Tile work and glass enclosure lead times drive most of the schedule, and a custom frameless enclosure can add a week on its own. We’ll give you a written timeline with the scope, and if a change order adds time, you’ll see it before you sign. Call (833) 842-1866 to talk through your timeline.
A full bathroom remodel in Santa Rosa runs $9,000 – $28,000, a small bathroom remodel runs $5,000 – $12,000, and a tub-to-shower conversion runs $3,500 – $10,000. Vanity installation sits at $800 – $3,000, and a walk-in shower installation is $4,500 – $12,000. The number depends on whether plumbing moves, the substrate condition, and finish level. Call (833) 842-1866 for an exact quote – estimates are free.
Yes – we install and service Toto and Kohler fixtures, Schluter waterproofing systems, and Grohe trim and valves. We know where each one tends to fail: Toto fill valves and flappers, Kohler aerators in harder water, Grohe cartridges that scale up and mimic low pressure. Schluter systems live or die on the install detail, so we check the drain flange and seam banding before tile goes down. Whether your bathroom has these brands or another make, we can help.
We can address active leaks and water damage quickly, and a live person answers the phone around the clock at (833) 842-1866. A failed shower pan or a supply line leak that’s wetting the floor below needs the water shut off first, then a plumber or our crew to open it up. A full remodel itself is planned work, not same-day, and we’ll tell you the honest timeline when you call rather than promise something we can’t deliver.
The 365-Day Done Right Promise backs every bathroom project: if it isn’t done right, we make it right, for a full year. The guarantee is printed on your paperwork and backed by a terms page, not an asterisk, and it sits on top of the manufacturer warranties on fixtures and materials. Every visit also includes a documented photo record of what we found and what we did, so you have evidence in hand if anything comes up. Call (833) 842-1866 if you have a warranty question.
Clear the room before the crew arrives – remove towels, toiletries, the shower curtain, and anything on the walls – and plan where you’ll shower and use a toilet during the job if it’s your only bathroom. If you’re in a one-bath home, tell us when you call, since we sequence the work to keep the toilet usable as long as possible. Anything else you should know shows up in the written scope. Call (833) 842-1866 and we’ll walk you through it.
Schedule Your Bathroom Remodeling Service in Santa Rosa Today
Call (833) 842-1866 for a free estimate. A live person answers around the clock, and you’ll get a flat written price with a written scope before any work starts. Our technicians have up to 19 years of experience, the crew is background-checked and uniformed, and every visit ends with a documented photo record. No obligation, no pressure – just a number you can compare. See our Bathroom Remodeling in Santa Rosa page for the full scope of what we do, and if the project runs into a driveway or a new door, our Driveway & Pavers and Windows & Doors teams can pick it up from there.
Written by the team at Rowan Construction Group.












