AfterFull Bathroom Remodeling in Santa Rosa, CA
A full bathroom remodel in Santa Rosa typically runs $28,000 to $62,000 for a standard hall or primary bath, and $70,000 and up once you move plumbing walls and expand the footprint. That range covers gutting to the studs, new waterproofing, tile, fixtures, cabinets, and a full paint and finish package. It is a different job from a cosmetic refresh: the room comes down to framing, the substrate gets inspected, and everything goes back in sequence with a written scope attached to every phase.
We handle full bathroom remodeling as one of seven residential trades because the failure points in a bathroom sit at the seams between them. A tile leak that shows up two years later is usually a plumbing rough-in problem a tile setter papered over. When the same company sets the rough-in, installs the Schluter waterproofing membrane, and signs off on the final walkthrough, there is one party accountable. We’re Rowan Construction Group Santa Rosa, and we put the price in writing before anyone picks up a tool. Call (833) 842-1866 for a free estimate.
For a broader look at the trade, including smaller-scope work like vanity swaps and partial updates, see our Bathroom Remodeling page. This page covers the full-gut version.
Key Takeaways
- Full gut remodels in Santa Rosa generally land between $28,000 and $62,000; structural or layout changes push higher.
- Every Rowan project gets a flat written price and written scope before work begins, per Clause 1 of the Haven Standard.
- No change order gets executed until you sign it. That discipline is why our projects finish within a few percent of the agreed number.
- Waterproofing is where bathroom remodels fail. We use Schluter membrane systems and document the installation with a photo record on every visit.
- The 365-Day Done Right Promise covers the work: if it’s not done right, we make it right.

When You Need Full Bathroom Remodeling
A full remodel makes sense when the problems are behind the tile, not on it. Here’s what we hear most often from homeowners across Santa Rosa:
- The 1970s tile-and-mastic shower is failing. We see this constantly in the older ranch homes around Montgomery Village and the Bennett Valley neighborhoods. Mastic adhesive behind wall tile breaks down after 30 to 40 years, and once water reaches the drywall backer, the whole assembly has to go. Regrouting buys a season at most.
- Water stains or soft spots near the shower pan. A stained ceiling below the bathroom or a floor that flexes around the drain means the pan or the waterproofing has already failed. That’s a demo-to-the-studs job, not a repair.
- You’re down to one usable bathroom. Dual-vanity conversions, a second bath added off a primary suite, or converting a half-bath to a full bath all require moving drains and supply lines, which means permits and full scope.
- The layout doesn’t fit how you live. A cramped tub-and-shower combo in a room that could hold a walk-in shower and a freestanding tub is a layout problem you can only fix by opening the floor and walls.
- You need aging-in-place features. Curbless entry, blocking for grab bars behind the wall, and a wider doorway require the walls open to install correctly. Retrofitting them later means tearing out tile.
- You’ve been quoted wildly different numbers and want a written one. Bring a competitor’s estimate and we’ll review it line by line at no charge through our Free Second Opinion offer. The differences between quotes almost always show up in the waterproofing scope and what was left out.
Sonoma County’s groundwater and seasonal moisture swings put more stress on bathroom envelope details than most of the country sees. We account for that in how we detail the pan and the wall assembly – specifics below.
Our Full Bathroom Remodeling Process
Every full bathroom remodel follows the same sequence. The steps don’t change because the calendar says so, and they don’t get skipped to hit a deadline.
- On-site measurement and assessment. We walk the room, check the substrate condition, look under the house if there’s crawlspace access, and photograph what we find. If you’re near Coffey Park or the Fountaingrove rebuild area, we pay particular attention to how previous repairs were done, since remodeled stock from the post-2017 rebuild years sometimes has details worth checking.
- Written scope and flat price. You get a written estimate with line items for demo, rough-in, waterproofing, tile, fixtures, cabinetry, and finishes – a number you can screenshot and compare, not a range delivered verbally. Under Clause 1 of the Haven Standard, that price is written before any work starts.
- Permits and inspections. Structural, plumbing, and electrical changes in Santa Rosa require permits through the city’s Building Division, with inspections at the rough-in stage. We handle the permit process and coordinate the inspection schedule as part of the scope.
- Demo and substrate inspection. The room comes down to studs and subfloor. If we find rot, termite damage, or a code issue hidden behind the old tile, that becomes a written change order. Nothing proceeds on it until you’ve signed. That’s the administrative discipline behind our projects finishing within a few percent of the original number.
- Rough-in and waterproofing. New supply lines and drains go in, then the tile backer and a bonded waterproofing membrane. We use Schluter systems for the shower pan and walls because the system is a tested assembly rather than a liquid applied over unknown backer. The membrane install gets photographed before tile covers it.
- Tile, fixtures, and finish. Tile set, grout, cabinetry, and fixtures. We specify Kohler or Toto fixtures for reliability and parts availability, and Grohe or similar pressure-balance valves for the shower trim. The final walkthrough includes a documented photo record of the finished work and the printed warranty, plus the start date on your 365-Day Done Right Promise.
Most full bathroom remodels run four to seven weeks from demo to final walkthrough, depending on tile complexity and whether the layout is changing. If you’re also updating adjacent rooms, our Kitchen Remodeling in Santa Rosa work uses the same scoping and change-order process, and doing both at once often saves on mobilization.

Full Bathroom Remodeling Pricing in Santa Rosa
Here’s what full bathroom remodels actually cost in Santa Rosa, broken out by scope. These are ranges from our written estimates, not marketing teasers. Your exact number depends on the room, the condition behind the walls, and the finish level you choose.
| Scope | Typical Price Range | What’s Included |
|---|---|---|
| Full gut, hall bath (approx. 40-50 sq ft) | $28,000 – $42,000 | Demo, new waterproofing, tile shower or tub surround, new fixtures, vanity, flooring, paint |
| Full gut, primary bath (approx. 60-90 sq ft) | $42,000 – $62,000 | Same as above, plus larger tile areas, dual vanity, possibly a freestanding tub |
| Layout change (moving a drain or wall) | Add $8,000 – $18,000 | Structural, plumbing relocation, extended permit scope |
| Curbless / aging-in-place conversion | Add $5,000 – $12,000 | Recessed pan, blocking, linear drain, wider doorway |
| Premium tile and stone | Add 15% – 40% to base | Large-format, slab, or natural stone install with the associated setting materials |
A few things move that number in either direction. A raised foundation makes plumbing relocation somewhat easier than a slab floor. Homes in Santa Rosa’s older core neighborhoods sometimes have galvanized supply lines that should be replaced while the walls are open, and doing it later means opening the same wall twice. Where the existing pan is recessed and the subfloor is solid, a curbless conversion costs less than one that requires reframing.
Every quote is a flat written price with a written scope and written warranty. We don’t say “call for a quote” – that’s the whole point of the Haven Standard. We’ll also review any competing written estimate line by line for free, and tell you honestly where their number is missing scope or ours is higher for a reason. Call (833) 842-1866 and we’ll schedule the measurement.
If your project also touches exterior work, our pages on Roofing in Santa Rosa and Windows and Doors in Santa Rosa describe the same written-price approach, and doing the envelope work while the bathroom is open can be more efficient than a separate mobilization later.
Why Waterproofing Is the Most Important Line Item
Most bathroom remodel failures two to five years out trace back to the waterproofing assembly. Tile and grout are not waterproof. The membrane underneath is. When a shower is built with cement board and a coat of liquid roll-on, and the manufacturer’s required thickness or cure time gets skipped, water finds its way to the framing. In our climate, the winter wet season and the cycle of condensation from a warm interior and a colder outer wall makes a good membrane more important, not less.
We use Schluter’s bonded membrane system – a sheet or bonded membrane with a tested assembly behind it – and photograph the install before tile goes over it. The photo record is a standard deliverable on every Rowan visit, not an upgrade. When the drain flange is set, the membrane laps, and the corners are pre-formed at each junction, the wall tells the story in the photos.
What the Documentation Includes
- A written estimate with a line-item scope and a flat price before work starts.
- Signed change orders for any scope variance, with a description of what was found and what the fix costs.
- A photo record of the substrate condition, the rough-in, the waterproofing membrane before tile, and the finished work.
- The printed written warranty and the 365-Day Done Right Promise terms on the final walkthrough.
FAQs – Full Bathroom Remodeling
How much does a full bathroom remodel cost in Santa Rosa?
A full bathroom remodel in Santa Rosa generally costs $28,000 to $42,000 for a hall bath and $42,000 to $62,000 for a primary bath, with layout changes adding $8,000 to $18,000. The low end of the range assumes standard finishes and no plumbing relocation. Call (833) 842-1866 for a written estimate on your specific room – the measurement is free.
How long does a full bathroom remodel take?
Most full bathroom remodels take four to seven weeks from demo to final walkthrough. Tile complexity, whether the layout changes, and permit inspection timing are the main variables. A layout change with a drain relocation typically adds one to two weeks because the rough-in inspection has to happen before the waterproofing goes in. We put the projected timeline in the written scope so you’re not guessing.
Can you fix a leaking shower without a full remodel?
Sometimes, but a leak that has reached the framing usually isn’t a repair. A small leak at a fixture or a failed caulk joint is fixable. A shower pan that has failed, or tile that has loosened from a disintegrated mastic bed, needs the assembly rebuilt. We’ll tell you which one you’re looking at after we open a small inspection area, and we’ll quote the smaller fix if it’s genuinely viable. Call for a free assessment before committing to the larger scope.
Do I need a permit for a full bathroom remodel in Santa Rosa?
Yes, if you’re moving plumbing, electrical, or changing walls. Like-for-like fixture replacement often doesn’t require a permit, but a full gut with a layout change does, and the work requires inspection at the rough-in stage. We handle the permit application and coordinate the inspections as part of the scope. If you’re unsure, ask when we do the on-site assessment – we’ll tell you what the project requires based on what we see.
What brands do you use for fixtures and tile?
We specify Kohler and Toto for toilets and sinks, Schluter for waterproofing assemblies, and Grohe for shower valves and trim where pressure balance matters. The brand list isn’t a preference – it reflects which products hold up and which have parts on the shelf when something needs service ten years out. If you have a specific brand or fixture you want, we’ll tell you honestly whether it fits the assembly and the budget line.
If your project is on the smaller side – a vanity replacement, a tile refresh, or a single fixture update – our Bathroom Remodeling overview covers that range, and the home page lists our other services and how the written-price approach applies across every trade. For full-gut work in Santa Rosa, call (833) 842-1866 – a live person answers, and we’ll schedule a measurement within the week.
Written by the team at Rowan Construction Group Santa Rosa, serving Santa Rosa.