







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Boral Home Additions & ADU: The Santa Rosa Owner’s Guide
We build and finish home additions and ADUs in Santa Rosa using Boral exterior and structural components, and a full addition typically runs $45,000 – $130,000 depending on size, foundation work, and finish level. An attached addition is planned work, not emergency work, so we schedule a site visit and deliver a written price before anything starts. Owners usually land on this page the way they find most building problems: a hairline crack that keeps reopening in a Boral trim panel, a fiber-cement soffit board that reads soft near the roof edge, or a deck fascia that has swollen after two wet winters. The material isn’t failing because it’s cheap. It’s failing because something behind it – flashing, a weep path, or a fastener – wasn’t done right the first time.
One note up front: Rowan Construction Group Santa Rosa is an independent construction contractor. We’re not affiliated with Boral, and we don’t sell Boral products. What we do is build with Boral materials to spec and replace failed components when the original installation goes wrong.
Key Takeaways
- A Santa Rosa addition runs $45,000 – $130,000; a detached ADU runs $90,000 – $220,000.
- Most Boral component failures here trace to water intrusion, not the material itself.
- We deliver a flat written price and written scope before any work begins.
- No change proceeds without a signed change order.
- Every visit includes a documented photo record at no extra charge.
Which Boral Models This Applies To

Boral makes a wide range of building products, and the two that come up most in Santa Rosa addition work are fiber-cement siding and trim (sold under the Boral brand and its TrueExterior line) and Boral cultured stone veneer for exterior cladding. If you’re trying to identify what’s on your house, start with three places: the original build or remodel permit on file with Santa Rosa’s planning department, the back of a loose siding panel (Boral fiber-cement typically carries a stamp with the product name and profile), and a caliper measurement. Standard fiber-cement lap siding runs 5/16 inch to 7/16 inch thick with a 6- to 8-inch exposure; if your measurement falls outside that, you may be looking at a different manufacturer’s board that was installed alongside Boral trim.
Here’s the compatibility gotcha that trips people up: Boral fiber-cement profiles don’t always match the nominal dimensions of competing brands, so a like-for-like replacement isn’t always like-for-like. A 5/4-inch Boral trim board measures closer to 1 inch actual, and dropping a competitor’s true 1-1/4-inch board into that run leaves a proud edge that catches water. Match by actual measured thickness, not by nominal name.
On the OEM-versus-aftermarket question, we’re direct about it. Boral replacement components make sense when the surrounding field is intact and you’re patching a small run. A quality aftermarket fiber-cement board from a vetted supplier makes sense when the failure is broader and you’re re-cladding a wall section, because the cost difference is real and the performance gap is small once the flashing and drainage plane are corrected. We source across more than fifty vetted brands in the same way we handle KraftMaid, Cambria, and Silestone selections – the written quote reflects an honest number, not an inflated one.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Boral Home Additions & ADU Is Failing
In Santa Rosa’s climate – wet winters, dry summers, and the Russian River fog that pushes moisture into north-facing walls – Boral components fail in predictable ways. Here’s what to look for and what’s actually causing each symptom.
- Hairline cracks that keep reopening at panel joints. This is usually movement, not material failure: the framing behind the panel is shifting or the fastener schedule was too sparse. If you caulk it and it splits again within a season, the panel needs to come off and the substrate checked.
- Soft or spongy spots near the roof edge and window corners. Water is getting behind the board and the fiber-cement is staying saturated. Nine times out of ten the culprit is missing or incorrectly lapped flashing, not the Boral board itself.
- Swollen or delaminating fascia at the deck ledger. Deck-to-house connections are the single most common moisture entry point we find on Santa Rosa additions. The Boral fascia absorbs what the flashing lets through.
- Chalky white residue that won’t wash off. Fiber-cement can effloresce when moisture moves through it. A little is normal; a persistent bloom across a whole wall means water is traveling through the assembly.
- Paint peeling in sheets rather than flakes. Sheet peeling points to moisture behind the coating. The paint is the messenger; the wall assembly is the problem.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Replacing failed Boral components on a Santa Rosa addition is quoted as a flat installed price, and the number depends on how much of the wall assembly has to come apart to correct what’s behind the board. Here’s the range picture for Santa Rosa:
| Scope | Installed Price Range |
|---|---|
| Home addition (full build, attached) | $45,000 – $130,000 |
| ADU construction (detached) | $90,000 – $220,000 |
| Garage conversion to living space | $30,000 – $80,000 |
What drives the number: foundation and site work, the size of the addition, whether the existing wall has to be opened to correct flashing or the drainage plane, and the finish level you choose. What’s included in every quote: a written scope, a flat price, the labor, the materials, and a written workmanship warranty. What’s not included and never will be: surprise change orders. No change proceeds until you’ve signed the change order, which is the discipline that has kept projects within a few percent of the agreed price across 4,000-plus jobs.
If you have a written estimate from another contractor, bring it. We’ll review it line by line at no charge as a free second opinion.
DIY or Call Us?
Some things you can safely check yourself. Walk the exterior after a rain and look for water staining below window sills and at deck connections. Measure your board thickness with a caliper and compare it to the spec. Press a screwdriver handle – not the blade – into suspect boards to see if they give. What you shouldn’t do is open a wall assembly or remove flashing to investigate, because you can turn a localized water problem into a much wider one in a single afternoon of the wrong pry bar. And don’t re-clad a section without confirming the drainage plane behind it is intact – putting new Boral board over a failed weather barrier is a guaranteed repeat.
Under Clause 1 of The Haven Standard, the price is written before anyone starts, so you’ll know the number before you commit. Call (833) 842-1866 to schedule your free estimate.
FAQs

Properly installed Boral fiber-cement siding typically performs for 30 to 50 years in Northern California conditions, but that lifespan assumes the flashing, drainage plane, and paint schedule are all correct. In our experience, failures show up in the first decade when moisture management is wrong, regardless of the material’s rated life.
Sometimes. A localized patch with matched Boral trim and corrected flashing is often the right call when the surrounding field is sound. When the soft spots span a whole wall or a repeating pattern at joints, replacement of the section is usually the more honest number. Call (833) 842-1866 for an exact quote – estimates are free.
A single-wall repair is typically a few days; an addition-scale rebuild is weeks to months depending on size and permits. We give you the schedule in writing with the price, and the photo record documents each stage. Contact us for a written timeline.
We match by actual measured thickness and profile, then source through vetted suppliers across more than fifty brands. We don’t stock parts and don’t carry them on a truck – every component is ordered to your specification, which is why the lead time is part of the written schedule.
Ready to get a written number? Call (833) 842-1866 for a free estimate on your Santa Rosa addition or ADU, backed by our 365-Day Done Right Promise.
Written by the team at Rowan Construction Group Santa Rosa, serving Santa Rosa and nearby areas.












