Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Tremron Home Additions & ADU: The Santa Rosa Owner’s Guide
Tremron-compatible additions and ADU parts are installed in Santa Rosa for $45,000 – $130,000 for a home addition, $90,000 – $220,000 for a full ADU, and $30,000 – $80,000 for a garage conversion. When we’re matching a specific Tremron-series component – a door unit, window package, or paver-matched hardscape transition – our technicians can usually confirm fit and source within a week. Availability depends on the series, and we don’t claim same-day dispatch on planned additions.
Owners almost always find out from the framing inspection or the first heavy rain, not from a showroom. A door that doesn’t seal to the ADU jamb, a threshold that lets water in, or a hardscape transition where the paver sits proud of the concrete walk – those are the moments you realize the part matters more than the finish schedule suggested.
Which Tremron Models This Applies To

“Tremron” here is doing double duty, and it’s worth naming the two product families before we go further. On the hardscape side, Tremron Series pavers (Olde English Wall, Mega Olde Towne, and the Milan and Tremron Stone lines) are what most Santa Rosa additions use for walkway transitions, porch aprons, and the sloped path from a new ADU door to grade. On the building side, Tremron-style modular door and window components are the trim-and-seal package around additions. They are not interchangeable. A paver from a Mega Olde Towne lot will not perfectly match an Olde English lot, even in the same color name – the molds run different face ratios. Order the full quantity from one pour, not two.
To identify the right component, check three things: the label on the original packaging (series and lot number), the exact face dimension (a 60mm paver is not the same substrate depth as an 80mm), and the color name. Take a photo with a tape measure across the face. That photo is what a distributor will ask for.
On the OEM-vs-aftermarket question: Tremron passthrough is fully compatible with quality aftermarket pavers, but the color match is not guaranteed. For structural door and window packages, we lean OEM or the original manufacturer’s listed equivalent. Rowan Construction Group Santa Rosa is an independent service provider and is not affiliated with Tremron. We source both.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Tremron Home Additions & ADU Is Failing
Five symptoms we see most often in Santa Rosa. Each maps to a specific cause, not a vague “wear and tear.”
- Water pooling at the ADU threshold. The paver or door-sill substrate has settled 1/8-inch or more. That small a slope change is enough to push water back toward the framing instead of away from it.
- Paver lip at the walkway transition. One paver rides 3/16 to 1/4 inch over its neighbor. Usually a base compaction failure, not a paver failure – the paver was fine, the 3/4-inch base washout underneath wasn’t.
- Efflorescence that comes back within weeks. A white salt haze on the pavers that returns after every wet season. That’s moisture traveling through the substrate with no vapor escape path, and it will keep returning until the base is corrected.
- Door unit binding or sticking in the new addition. The jamb material or sill has swelled after the first rainy season. Santa Rosa’s winter wet-dry cycle is hard on wood components – a factory-sealed unit holds, a job-site-primed one often doesn’t.
- Cracks following the framing line. If a crack in the concrete apron runs parallel to a wall, the apron is bearing on a moving footing, not shrinking on its own.
Replacement Cost & What’s Included

Number first, because that’s the only number that matters before pencil meets paper.
- Home Addition (full scope): $45,000 – $130,000. Includes permits, framing, substrate correction, paver-matched exterior hardscape transition, and finish.
- ADU Construction: $90,000 – $220,000. Includes detached or attached scope, utility tie-ins, and the hardscape apron.
- Garage Conversion: $30,000 – $80,000. Includes egress, door unit replacement, and the paver threshold.
- Component-only replacement (paver field, door unit, or threshold): priced separately, line-itemed.
The range drivers are honest: foundation conditions in Santa Rosa’s clay-heavy soils, whether the original base was compacted to 95% or just dumped, door and window package specification, and permit cycle time. Every quote is a flat written price with a written scope before work starts. No change proceeds without a signed change order – Clause 1 of the Haven Standard. If you have a competitor’s written estimate, we’ll review it line by line at no charge.
See the difference
Before
After
Before
After
Before
AfterDIY or Call Us?
What you can safely do yourself: photograph the failed area with a tape measure, note the lot number from the original packaging, and clear the area of loose material so a crew can see the substrate. That’s it.
What we don’t recommend for a homeowner: resetting a door unit or window package in a new addition (structural load path and waterproofing integration), and re-laying a paver field (base compaction and drainage are where DIY fails, and they fail six months later, not the day you finish).
Most of the value of a correct fix comes from getting the base and the seal right the first time. Call (833) 842-1866 and we’ll tell you what we see.
FAQs

How long should a Tremron paver or door package last in Santa Rosa? A properly installed Tremron paver field lasts 25 to 30 years in Santa Rosa’s climate; a factory-sealed door unit in a new addition, 15 to 20. The variable isn’t the product – it’s the base compaction and the sill waterproofing.
Can the failed component be repaired instead of replaced? Sometimes. A 1/8-inch paver lip or a single settled section can be lifted, re-based, and re-set without replacing the field. A door unit that’s binding at the sill almost always needs replacement, because the wood has swollen past recovery.
How long does the swap take? A single paver-field section, half a day. A door unit in an ADU wall, one to two days. A full addition or ADU replacement is measured in weeks and depends on permit cycle time, not crew hours.
How do you source the part? We work from fifty-plus vetted material brands and can match against a lot number, a face-dimension photo, or a distributor’s inventory. If the original Tremron series is discontinued, we identify the closest current equivalent and quote both – OEM and the quality aftermarket match – so you choose. We don’t carry parts on a truck; sourcing is ordered to your project.
We also install KraftMaid, Cambria, and Silestone finishes when the addition calls for cabinetry or countertop work, so the scope stays in one quote rather than three.
Get a Written Price Before Anyone Starts
Call (833) 842-1866 for a free estimate on your Tremron-compatible addition or ADU in Santa Rosa. You’ll get a flat written price, a written scope, and a written warranty before work begins – and if it’s not done right within 365 days, we make it right under the 365-Day Done Right Promise.
Written by the team at Rowan Construction Group Santa Rosa, serving Santa Rosa and nearby areas.