







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Unilock Bathroom Remodeling: The Santa Rosa Owner’s Guide
We install Unilock-compatible bathroom remodeling for Santa Rosa homeowners, and the typical installed range for a full bathroom remodel here runs $9,000 – $28,000, with smaller rooms landing between $5,000 and $12,000. If you’re searching for a part, we don’t stock parts and we don’t carry them on a truck, but we can identify what your Unilock system needs, source it, and install it correctly. Rowan Construction Group Santa Rosa is an independent service provider and is not affiliated with Unilock. Most owners find us after pulling a loose shower door roller, a cracked threshold cap, or a failing waterproofing membrane and realizing the piece isn’t sold at a local big-box store. The discovery usually starts small: a door that won’t glide, a grout line that keeps coming back wet.
Which Unilock Models This Applies To
Unilock makes paving and hardscape products first, and Santa Rosa homes that show “Unilock” in a bathroom context usually have a Unilock-sourced paver, step, or slab used as a shower floor, a threshold, or a decorative inlay. That means the “model” you’re matching is a paver profile, not a bathroom fixture line. The fastest way to identify it: pull the exact measurements (length, width, thickness to the eighth of an inch), photograph the surface texture and the color name on any remaining carton label, and check for a stamped logo or profile number on the underside. Thickness is the gotcha. Unilock pavers commonly run in the 2 3/8-inch and 2 3/4-inch ranges, and swapping a 2 3/8-inch paver for a 2 3/4-inch one changes your finished floor height, your door clearance, and your shower curb by nearly half an inch. On OEM versus aftermarket: for a decorative slab or paver there’s usually no electrical or mechanical “part” to fail, so an exact Unilock match matters most for color and thickness. A quality aftermarket porcelain or natural-stone equivalent works if the thickness and slip rating line up. We also install KraftMaid, Cambria, and Silestone components in the same rooms.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Unilock Bathroom Remodeling Is Failing
- Efflorescence you keep scrubbing back. That white powder on a Unilock paver shower floor is mineral salt pushed up by moisture migrating through the stone, which points to a failed waterproofing layer underneath rather than a dirty surface.
- Grout that stays dark after a shower. Persistent damp grout around a paver shower base means the slope isn’t shedding water to the drain the way it should, so it pools and soaks in.
- Loose or hollow-sounding pavers. A tap test that rings hollow tells you the thinset or mortar bed has let go, common where a large paver was set over a substrate that wasn’t flat or fully cured.
- A door or panel that drags. A paver threshold set slightly high or a floor that shifted lifts the finished surface past the door swing, and the friction shows up as scraping.
- Staining along the curb or wall base. Dark wicking lines at the curb and wall joints are the tell for trapped water, and by the time you see them the substrate behind the paver is usually wet.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included
In Santa Rosa, installing a new paver or slab element in a bathroom – a shower floor, a threshold, a decorative wall detail – typically runs within our bathroom remodel range of $9,000 – $28,000 when it’s part of a room rebuild, and a focused shower replacement lands between $3,000 and $8,500. What moves the number: whether the waterproofing has to be torn out and rebuilt, the cost of the replacement Unilock paver or a compatible stone, and access if the piece sits behind a glass panel. Every quote is a flat written price with line-item scope before work starts. No change proceeds until the change order is signed. If we have to alter the plan, you get the number first. We bring a free second opinion on any written estimate you’re holding – bring a competitor’s quote and we’ll read it line by line at no charge. Workmanship is covered by the 365-Day Done Right Promise: if it’s not right, we make it right.
DIY or Call Us?
You can safely do the detective work: measure the paver, photograph the stamp, note the thickness, and check how the floor drains. What goes wrong for homeowners is removal and resetting. Pulling a paver out of a shower floor means cutting through the waterproof membrane you can see and the one you can’t, and the tile-over-paver joint is unforgiving if you don’t re-establish the slope and the membrane seal. We’ve seen plenty of reseal attempts fail within a season because the water was getting behind the stone to begin with. That’s a project, not an afternoon. If you want to understand the job before committing, call Rowan Construction Group at (833) 842-1866 for a free estimate – a live person answers around the clock, and every visit includes a documented photo record of what we found.
FAQs

How long does a Unilock paver in a bathroom last? A paver set correctly over a properly sloped, waterproofed bed typically lasts 20 years or more, but in Santa Rosa’s wet winter months the failure point is almost always the waterproofing beneath it, not the stone – moisture from seasonal rain and shower use finds the weakest seal first, so the paver outlives the membrane if the original install cut corners. Call (833) 842-1866 for a quote – estimates are free.
Can it be repaired instead of replaced? Often yes for a single loose paver, provided the membrane below is still intact and the slope is correct; if the paver is cracked, stained, or water has reached the substrate, replacement is the honest answer rather than a patch that fails again next spring. We’ll tell you which it is after we look. Call (833) 842-1866 to schedule the visit.
How long does the swap take? A focused single-paver reset or threshold replacement is usually a day or two, while a shower floor rebuild with new waterproofing runs three to five days depending on cure time and whether glass has to come out. You get a written scope with a finish date before anyone starts. Call (833) 842-1866 for an exact timeline on your room.
How do you source the part? We match your paver by thickness, color, and profile from our vetted material brands and suppliers, and we photograph the original before ordering so we’re not guessing. Because thickness and finish drive the match, we confirm the spec against what’s on your floor rather than relying on a model number alone. Call (833) 842-1866 to start the sourcing.
Written by the team at Rowan Construction Group Santa Rosa, serving Santa Rosa and nearby areas.












